Johannesburg

Friday

Sunny. Cool.

1°C
18°C

7 day forecasts

Nasa delays Mars mission

2008-12-04 22:23

Washington - Technical glitches have forced US space agency Nasa to delay the launch of a landmark mission to Mars, which was due to lift off in the autumn of next year, officials said on Thursday.

"We will not be ready to launch Mars Science Lab by the hoped-for date next year," Nasa administrator Michael Griffin told a news conference.

"Because of a number of factors that need to be addressed, we are slipping the launch to 2011," he said.

The delay from the scheduled launch will add around $400m to the already over-budget Mars Science Lab project, which aims to assess whether microbial life ever existed on the red planet and still exists now.

With the delay factored in, the life-cycle cost of Mars Science Lab will rise to some $2.3bn, Nasa estimated.

'Failure not an option'

But the delay was essential because it will allow for "resolution of any remaining technical problems, proper and thorough testing, and to avoid a mad dash to launch," said Ed Weiler, associate administrator for Nasa's science mission directorate.

"Failure is not an option on this mission.

"The science is too important and the investment of American taxpayer dollars compels us to be absolutely certain that we have done everything possible to ensure the success of this flagship planetary mission," he said.

The main reason for putting back the launch date was unresolved problems with actuator motors on the rover, which Nasa says will carry the most advanced suite of instruments for scientific studies ever sent to the surface of Mars.

The actuators are "very complicated devices that drive the wheels of rovers, and are the elbow, shoulder and wrist joints for the robotic arm", said Doug McCuistion, director of the Mars Exploration Programme at Nasa headquarters.

Ton of junk

"The actuator is a combination of a motor and a gearbox that drive the robotic arm.

"Actuators are absolutely crucial to any landed mission because if we get on the ground, can't move, can't get the arm out, can't take samples, we basically have a metric ton of junk on the surface," he said.

The Mars Science Lab rover has 31 different actuators. Nasa is building 60 flight actuators and 45 engineering model actuators for the mission.

Only one has been finished, meaning Nasa has not been able to test the motors.

Problems with the actuators have included faulty workmanship and a problem with the braking system, which McCuistion admitted "we don't understand yet".

Launches opportunities for Mars only come every 26 months because of the alignment of the planets, the Nasa officials said.

The window for launching Mars Science Lab in 2011 extends from October to December of that year.

- AFP

inside news24

Cpt: 14-19°C Passing showers. Afternoon clouds. Mild. Pta: 4-21°C Sunny. Refreshingly cool.
Jhb: 1-18°C Sunny. Cool. Bloem: 2-18°C Sunny. Cool.
Dbn: 14-25°C Sunny. Mild. PE: 15-26°C Sunny. Pleasantly warm.
7 day forecasts...
Western Cape Eastern Cape Kwazulu Natal Gauteng

Kraaifontein - 05:36:38 AM Road closed at the N1 Highway Interchange More traffic reports...

Cape Town - Here are the winning Lotto numbers from the Wednesday, July 8 draw.

7, 10, 21, 30, 37, 39 Bonus 8

Lotto Plus: 2, 5, 14, 16, 19, 44 Bonus 23

SMS the word Lotto to 31222 to get lotto numbers sent directly to your phone.
 
More lotto numbers...

Jobs - Find your dream job

Sales Director

KwaZulu Natal
The Unlimited World

Web Developer

Gauteng
Quiglies Solutions

CLIENT RELATIONSHIP OFFICER

Gauteng - JHB North/Sandton
Emmanuels Staffing Solutions
R220,000-250,000 Per Annum Cost To Company Incl Benefits

Cars - Search 1000's of new and used cars

AUDI

A4’s From R199 000

VOLKSWAGEN

New Golf GTI From R317 300

LAND ROVER

Discovery 3 4.4 V8 HSE 4x4 AT
2006
375000

NISSAN

Tiida 1.6 Visia+
2007
105990

PROTON

Gen 2 1.6 GL 5-dr
2006
79900

Property - Find a new home

THE WILDS

Single Residential 4,200,000

STEYNSRUST

Single Residential 3,500,000

XANADU

Single Residential 3,910,000

Travel - Look, Book, Go!