Hello 

Create Profile

Creating your profile will enable you to submit photos and stories to get published on News24.


Please provide a username for your profile page:

This username must be unique, cannot be edited and will be used in the URL to your profile page across the entire 24.com network.

Settings

Location Settings

News24 allows you to edit the display of certain components based on a location. If you wish to personalise the page based on your preferences, please select a location for each component and click "Submit" in order for the changes to take affect.









Facebook Sign-In

Hi News addict,

Join the News24 Community to be involved in breaking the news.

Log in with Facebook to comment and personalise news, weather and listings.

 
 

Nasa to abandon 2013 ship goal?

2008-07-17 19:08
line

Washington - Money problems will likely force Nasa to abandon its ambitious internal goal of having a new moon spaceship ready by 2013, a top space agency official told The Associated Press on Wednesday.

The agency should still be able to meet its public commitment to test launch astronauts in the first Orion capsule by March 2015, the official said, unless national budget stalemates continue.

But the agency's own hurry-up plan to get the job done even earlier - with a first crew launch by 2013 - will "very likely" be changed during meetings this week in Houston, said Doug Cooke, Nasa's deputy associate administrator for exploration.

"We're probably going to have to move our target date," Cooke said in a phone interview. An actual astronaut moon landing is still set for 2020. Orion initially will just orbit Earth before attempting a more complicated moon launch that also will involve unmanned rockets.

Cooke acknowledged the slipped launch target date during an interview about an internal Nasa report leaked to the web site, Nasa Watch.

Leaked report

The document shows that the space agency's overall moon plan has encountered financial and technical problems, which Nasa says it can overcome.

The leaked report reflects typical problems of a programme this early in the running, Cooke said.

"What you're seeing is sausage-making," he said. "I'm really satisfied with the work that's getting done."

The 117-page report, posted on Wednesday at nasawatch.com, shows an $80m cost overrun this year for just one motor and a dozen different technical problems that the space agency put in the top risk zone, meaning the problems are considered severe. The report put the program's financial performance in that category.

Technical problems included software that may not be developed on time, the heat shield, a dangerous level of shaking during launch, and a hard-to-open hatch door.

The report also said Nasa's plans would shortchange astronauts' daily water needs, giving them only two litres a day when medical experts say they need at least 2.5 litres.

The report showed technical problems in operations for Orion nearly doubling from May to July, with 24 items now on the most worrisome list.

'Dysfunctional government'

Outside experts say it's too early to be too worried, but they have some concerns.

"It doesn't surprise me that there are these kinds of pains given the early stage (of development) and the long time since we did anything like this," said John Logsdon, director of space policy at George Washington University. "Nasa is trying to do this with inadequate and uncertain funding."

The problem is mostly the political system for not coming up with budgets that are passed and signed by the president so that Nasa can go ahead with its financial plans, said W Henry Lambright, a technology and public policy professor at Syracuse University. The budget for next year still has not been passed.

"We have a government that is dysfunctional," Lambright said. "I'm not blaming Nasa. I think Nasa is a victim of a political situation we have in this country."

But Nasa Watch's Keith Cowing, a former engineer for the agency, said the problem is poor design and planning, repeating some of the problems of Apollo without learning the lessons of such disasters as the Apollo 1 fire.

A group of Nasa engineers, working on their own time, and other experts have come up with an alternate moon rocket design that they contend is cheaper and could be ready earlier. Nasa has rejected their proposal.

- AP

inside news24

 
1 of 10

140
1

Latest comment in Sci-Tech

JPWhiteHome says... Looking upstream to find pollution in the generation of electricity is a valid analysis. I am left to wonder if the researchers also accounted for the electric it takes to refine oil into gasoline, or the fuel to transport it half way round the world, cost of transporting refined gas to the gas stations. I find it hard to believe there is more pollution from electric generation than oil activities such as exploring, drilling, transporting, refining, transporting, pumping and burning. Not to mention the fuel expended to wage war to protect the supply of oil. Read the article...

 
Traffic
Lottery
 
  • Friday Carletonville - 10:01 AM
    Road name: N14
    ROAD CLOSED due to a large sink-hole between the two Carletonville exits - traffic is diverted onto a local bypass route
  • Sunday Volksrust - 07:33 AM
    Road name: N11 Both Ways
    Stop / go controls for construction works at Majuba Pass - expect delays between Volksrust and Newcastle
  • Monday Centurion - 15:41 PM
    Road name: Jean Avenue
    ROAD CLOSED between Rabie Street and Gerhard Street for sink hole repair works
 
More traffic reports...
 

Jobs [change area]

Cars[change area]

HONDA

Civic 1.8 LXi AT
2009
R 154,950.00

FORD

Figo 1.4 Ambiente 5-dr
2011
R 99,899.00

FORD

Fiesta 1.6 Titanium 3-dr MY10
2009
R 154,950.00

Property [change area]

Travel - Look, Book, Go!

Romance at the President

Spend two nights at the Protea Hotel President in Cape Town from R2601 per person sharing. Includes return flights, taxes, car hire and accommodation. Book Now!

Kalahari.com - shop online today

The Big Mama Sale

The Big Mama Sale is now on. Get up to 80% off Books, Music, DVDs, Games, Electronics, Toys & Gifts. Shop now.

Electronics on Sale

Up to 80% off electronics + 24hr delivery. Shop now.

50% Off Educo toys

Join the Big Mama Sale madness at kalahari.com and get 50% off all Educo toys for your kids. Terms and conditions apply. Shop now.

Books on Sale

Up to 80% off books & 1000s Of books to choose from. First come, first served. While stocks last. Shop now.

Blu-ray special offer

Buy 10 blu-rays and get a free Sony blu-ray player. Offer valid while stocks last. Shop now.

OLX Free Classifieds [change area]

Drain & Pipe Inspection System

For Sale, Garage Sale in South Africa, Gauteng, Johannesburg. Date January 21

2011 Mazda 2 1.5 Dynamic

Vehicles, Cars in South Africa, Gauteng, Johannesburg. Date January 22

Estimator

Jobs, Engineering Jobs - Architecture Jobs in South Africa, Gauteng, Johannesburg. Date January 21

Apple iPad 2 Black 16GB 9.7" Tablet With WiFi & 3G

Two cameras for FaceTime and HD video recording. The dual-core...

From R5849.00

I'm shopping for:

A local community where you can meet people, upload photos, videos and loads more...
There are new stories on the homepage. Click here to see them.