Hello 

Create Profile

Creating your profile will enable you to submit photos and stories to get published on News24.


Please provide a username for your profile page:

This username must be unique, cannot be edited and will be used in the URL to your profile page across the entire 24.com network.

Settings

Location Settings

News24 allows you to edit the display of certain components based on a location. If you wish to personalise the page based on your preferences, please select a location for each component and click "Submit" in order for the changes to take affect.









Facebook Sign-In

Hi News addict,

Join the News24 Community to be involved in breaking the news.

Log in with Facebook to comment and personalise news, weather and listings.

 
 

Time running out for Athens

2004-05-04 13:06
line

Athens - Come Wednesday dawn Athens counts exactly 100 days to go before showtime for the August 13-29 Olympics.

And as the clock ticks the Greek government whip is literally cracking over building firms as several key projects, notably the roof over the main stadium and the marathon course, are still in limbo.

"Disrespect of completion deadlines will entail the full range of legal sanctions, including withdrawal of operating licences," Greek Public Works Minister Yiorgos Souflias thundered in parliament.

'Surprise' ministerial visits to the worksites have become the rule rather than the exception as constructors have beefed up hirings in a bid to beat deadlines by sheer manpower with work at some sites around the clock.

The 18 000 ton glass-metal roof of the main Olympic stadium remains the biggest headache.

Its basic structure, consisting of two twin arches, each with dozens of metal girders hooked to them, looks finished.

But despite assurances that the arches would start sliding across a 60m distance into their final place on the two sides of the stadium by April 28, engineers still hesitate to budge them.

"There was a problem with a part that took us three days to resolve," an official at the worksite told AFP.

High winds are also hampering work. "It's difficult for workers to operate on strong winds at such a high altitude," said another engineer.

"We make up for lost time by doing work that was scheduled to have started after the sliding," said a source close to the roof's Spanish architect Santiago Calatrava.

Working precariously high above the ground, construction teams are already attaching semi-transparent polycarbon plates to the roof's bare ribs.

June 30 remains the deadline for the roof's completion. The International Olympic Committee (IOC) has said that roof work has to be finished by then in order to begin more vital work within the 20-year-old stadium.

Thousands of seats and giant screens have yet to be installed and television cables to be rolled out.

The roof's parts also have to move to make room for landscaping works around the stadium. Around half of the 2 700 trees scheduled to be planted in the 100-hectares surrounding area still wait to take roots.

The half-finished 42km marathon course is another major headache. Organisers have promised an idyllic, olive tree lined course. But much of the road still resembles First World War trenches. An AFP correspondent visiting the site on Sunday saw around a hundred workers busily digging at various parts of the building site.

inside news24

 
1 of 10

140
1
 
Traffic
Lottery
 
  • Friday Carletonville - 10:01 AM
    Road name: N14
    ROAD CLOSED due to a large sink-hole between the two Carletonville exits - traffic is diverted onto a local bypass route
  • Sunday Volksrust - 07:33 AM
    Road name: N11 Both Ways
    Stop / go controls for construction works at Majuba Pass - expect delays between Volksrust and Newcastle
  • Monday Centurion - 15:41 PM
    Road name: Jean Avenue
    ROAD CLOSED between Rabie Street and Gerhard Street for sink hole repair works
 
More traffic reports...
 

Jobs [change area]

Cars[change area]

OPEL

Corsa 1.4 Sport 5-dr MY05
2006
R 59,900.00

HONDA

Insight 1.3 Hybrid 5-dr CVT
2011
R 179,950.00

MERCEDES

CL 65 AMG Coupe 7-sp AT
2008
R 979,877.00

Property [change area]

Travel - Look, Book, Go!

Romance at the President

Spend two nights at the Protea Hotel President in Cape Town from R2601 per person sharing. Includes return flights, taxes, car hire and accommodation. Book Now!

Kalahari.com - shop online today

The Big Mama Sale

The Big Mama Sale is now on. Get up to 80% off Books, Music, DVDs, Games, Electronics, Toys & Gifts. Shop now.

Electronics on Sale

Up to 80% off electronics + 24hr delivery. Shop now.

50% Off Educo toys

Join the Big Mama Sale madness at kalahari.com and get 50% off all Educo toys for your kids. Terms and conditions apply. Shop now.

Books on Sale

Up to 80% off books & 1000s Of books to choose from. First come, first served. While stocks last. Shop now.

Blu-ray special offer

Buy 10 blu-rays and get a free Sony blu-ray player. Offer valid while stocks last. Shop now.

OLX Free Classifieds [change area]

Drain & Pipe Inspection System

For Sale, Garage Sale in South Africa, Gauteng, Johannesburg. Date January 21

2011 Mazda 2 1.5 Dynamic

Vehicles, Cars in South Africa, Gauteng, Johannesburg. Date January 22

Estimator

Jobs, Engineering Jobs - Architecture Jobs in South Africa, Gauteng, Johannesburg. Date January 21

The Big Mama Sale

The Big Mama Sale is now on. Get up to 80% off Books, Music, DVDs, Games, Electronics, Toys & Gifts. Shop now.

Visit www.kalahari.com for millions of books, music, DVDs, games & more!

Nokia E7

Your mobile office Real-time emails with Mail for Exchange. Easy access to...

From R3399.00

I'm shopping for:

A local community where you can meet people, upload photos, videos and loads more...
There are new stories on the homepage. Click here to see them.