Pondering the water shortage

SINCE February, the water volume in Midmar Dam has been reported to lie between 44% and 46%, the last reading of 46% being on 14
August.

This is a period of six-and-a-half months during which, for the most part, water restrictions have been applied to local residents. Over a similar period, the water volume in Henley Dam has been reported as being +100%, that is, a full dam and water flowing over the spillway.
The last reading was 101% on 14 August.

I ponder the following - if Midmar Dam does not change in volume over six months, are water restrictions then really necessary?

If restrictions are required, then why is the asset of Henley Dam and its waterworks not in operation to alleviate the situation in Msunduzi, rather than letting water go to waste over the spillway?

R. WELLS

Hilton

We live in a world where facts and fiction get blurred
In times of uncertainty you need journalism you can trust. For only R75 per month, you have access to a world of in-depth analyses, investigative journalism, top opinions and a range of features. Journalism strengthens democracy. Invest in the future today.
Subscribe to News24
Lockdown For
DAYS
HRS
MINS
Voting Booth
When a Covid-19 vaccine for under 16's becomes available, will you be taking your children to get it?
Please select an option Oops! Something went wrong, please try again later.
Results
Yes, immediately!
38% - 4417 votes
I'll wait to see how others respond
26% - 2972 votes
No, I don't think they need it
36% - 4209 votes
Vote
ZAR/USD
15.50
(+0.13)
ZAR/GBP
21.45
(-0.05)
ZAR/EUR
18.37
(+0.08)
ZAR/AUD
11.88
(+0.03)
ZAR/JPY
0.14
(+0.38)
Gold
1688.29
(+0.23)
Silver
25.34
(+0.73)
Platinum
1150.01
(+1.19)
Brent Crude
68.09
(-1.61)
Palladium
2314.00
(+0.54)
All Share
68426.17
(+0.23)
Top 40
62910.60
(+0.19)
Financial 15
12747.28
(-0.10)
Industrial 25
87156.37
(-0.52)
Resource 10
71780.93
(+1.38)
All JSE data delayed by at least 15 minutes morningstar logo